A trio of Norfolk Southern engines lead NS 168 as they make their way across the New River Bridge northbound on the NS CNO&TP (Rathole) Subdivision at New River, Tennessee. On April 29th, 2024.  

According to the Historic Bridges website: This bridge is a very large high level deck cantilever truss bridge. It was constructed in 1963 and as such is a late example of its type, but still noteworthy as an uncommon structure type and for its size. Typical of 1960s truss bridges, the bridge still has riveted built-up beams, but v-lacing and lattice are absent in the built-up beams, and truss connections are bolted instead of riveted. It is 1,622.0 Feet (494.4 Meters) long, with 3 Main Span(s) and 6 Approach Span(s) is over 300 feet above the river.

Tech Info: DJI Mavic 3 Classic Drone, RAW, 22mm, f/2.8, 1/2000, ISO 120.

#railroad #railroads #train #trains #bestphoto #railroadengines #picturesoftrains #picturesofrailway #bestphotograph #photographyoftrains #trainphotography #JimPearsonPhotography #nscnotpsubdivision #norfolksouthern #trendingphoto #nsnewriverbridge

NS 168 makes their way across the New River Bridge at New River, Tennessee

A trio of Norfolk Southern engines lead NS 168 as they make their way across the New River Bridge northbound on the NS CNO&TP (Rathole) Subdivision at New River, Tennessee. On April 29th, 2024.

According to the Historic Bridges website: This bridge is a very large high level deck cantilever truss bridge. It was constructed in 1963 and as such is a late example of its type, but still noteworthy as an uncommon structure type and for its size. Typical of 1960s truss bridges, the bridge still has riveted built-up beams, but v-lacing and lattice are absent in the built-up beams, and truss connections are bolted instead of riveted. It is 1,622.0 Feet (494.4 Meters) long, with 3 Main Span(s) and 6 Approach Span(s) is over 300 feet above the river.

Tech Info: DJI Mavic 3 Classic Drone, RAW, 22mm, f/2.8, 1/2000, ISO 120.