March 7, 2015 – Crew Change on CSX G038 March 7, 2015 – A fresh crew heads for loaded grain train CSX G038 in the siding at the south end of Rankin siding, with BNSF 4851 in the lead, as the signals are aligned for hot intermodal CSX Q028 at Rankin, Ky on the Henderson Subdivision.