August 9, 2015 – Paducah and Louisville Railway’s UK 4522 and UL 2014, with PAL 4510 head through Beaver Dam, Ky as they move their loaded LG2 coal train north. – Tech Info: 1/1000sec, f/6.3, ISO 1250, Lens: Tamron 150-600 @ 600mm with a Nikon D800 shot and processed in RAW.
August 9, 2015 – Paducah and Louisville Railway’s UK 4522 and UL 2014, with PAL 4510 head through Beaver Dam, Ky as they move their loaded LG2 coal train north. – Tech Info: 1/1000sec, f/6.3, ISO 450, Lens: Tamron 150-600 @ 150mm with a Nikon D800 shot and processed in RAW. ?#?jimstrainphotos?